Operational Update On VIneyard Wind Turbine Recovery

Vineyard Wind is updating its operational status and plans.

The summary focused on safe removal of the remains of the damaged turbine blade which failed last month.

Resultant debris is being collected by Vineyard Wind teams, as it continues to wash ashore along the Cape and Islands.

Turbine installation is ongoing, and the aim is to bring Vineyard Wind 1 back online in the near future through consultation with the federal Bureau of Safety and Environmental Enforcement, along with the US Coast Guard.

Inspections and review will be required before this occurs.

(Photo by NICOLAS MAETERLINCK/BELGA MAG/AFP via Getty Images)

VLISSINGEN ENERGY OFFSHORE WIND PARK CONSTRUCTION

Photo: NICOLAS MAETERLINCK / AFP / Getty Images


Sponsored Content

Sponsored Content