Pavement repairs are scheduled for the Bourne Bridge.
Contractors working for the U.S. Army Corps of Engineers will make the repairs starting at 8 pm, with a finish time of 5 am Tuesday.
Bridge traffic will be reduced to one lane in each direction.
Wide loads will be banned from the bridge during the project.
(Justin Sullivan / Getty Images News)